Job Description
We are now recruiting for the exciting role of Chief Design Engineer - Installations, to be involved in an industry leading, cutting-edge project for a new type of power station.
We are Rolls-Royce SMR and we’re doing something that’s never been done before. We’re revolutionising an industry. That’s a once-in-a-career opportunity for those excited by such a challenge. This is more than just a job; this is a legacy.
Role Purpose
Reporting to the Chief Integration Engineer, the Chief Design Engineer – Installations is accountable for leading the development of the physical RR SMR power station reactor island installations layout design, as well as the containment vessel engineering design, mechanical handling and development of modular Mechanical Electrical and Plumbing (MEP) solutions.
This role will be responsible for ensuring the installation aspects of the power station design are matured consistently with all design factors understood and managed. The role will require extensive interfacing and team working around the entire reactor island design programme, internally and externally, developing the installations of all systems, structures and components of the RR SMR with a clear focus on all power station level key attributes.
The role is accountable for leadership of the following ke...