Migration Set-up
Set-up Refresh Clinic
Move the required quantity of devices as instructed by the
Contractor Engineer and Site Manager from the onsite storage location to the Refresh
Clinic location
Login to any system as required via device(s) provided by
the contractor’s engineer and Site Manager and under their instructions
Refresh laptops
Collect existing devices from users and handover new devices
in accordance with the migration schedule and project processes
Handover and collect the correct number of devices each in
accordance with the migration schedule
Correctly update the Contractor’s workflow management system
at all relevant steps
Report issues arising from migration activity promptly and
accurately to the contractor Engineer and Site Manager
Where issues cannot be resolved immediately, pass them over
to an onsite Post Migration Support Engineer
Conduct manual stock checks daily and report findings to the
contractor Engineer and site Manager
Place existing devices collected from users at the Refresh
Clinic within the packaging that was used to contain a new device and in
accordance with the device Designation Rules mark the outside of the box to
indicate whether it is for “disposal” or for Refurbishment
At the end of each day, move all the devices and equipment
into the onsite storage location.
SC clearance is required...