VolkerFitzpatrick offers a range and depth of civil engineering, infrastructure and building services. We contribute to vital parts of the nation's life through projects of strategic importance, while delivering those less visible, yet essential, works required by both private and public sectors. We build, renew, maintain highways, airports, railway infrastructure, and commercial, industrial and educational buildings.
We have an exciting opportunity for an Administrator to join our project on a permanent basis.
The M3 Junction 9 Improvement Scheme is located in the South East of England to the East of Winchester in Hampshire within the South Downs National Park. The junction experiences significant delays and lengthy queues are common on the northbound off-slip of the M3 and the southbound A34. Traffic levels are heavy, especially between the M3 and the A34. More than 6,000 vehicles pass through junction 9 every hour during peak periods. This requires the following. DCO High Level Requirement is 'To change the junction so that it has free flowing links between the A34 and the M3 in both directions.' Start of Works March 2025 and Completion Autumn 2027.
The scheme comprises of 330,000m3 of earthworks of which approximately 50,000m3 requires modification. 2 x 125m long Underpasses that will be constructed using the top down method with contiguous pile walls, 2 x 45m span steel gyratory bridges with piled FRC abutments, 35m span steel truss footbridge w...