Requirements
Minimum Offshore Cert Requirements:
* BOSIET or GWO BST or SSTW together with OGUK Medical
Additional Requirements:
* Must have experience in offshore wind farm inspection campaigns including performing structural general and close visual inspections, Cathodic Protection and Scour Surveys.
ROV System
* Seatronics VALOR ROV
* Sonardyne Mini Ranger 2
* Sonardyne Sub Mini 6+
* Octans Nano Compact
* Valeport 106
* Valeport Midas
* Contact CP System
* Digital Video Recording – Digi Edge or equivalent
Work Scope
A High-level summary of the scope of work includes:
* Conduct general / close visual inspection of the critical connections and structures.
* Conduct MGM and CP surveys.
* Conduct CPS and Cable inspections and measurements.
* Conduct J Tube Inspections and measurements.
* Conduct seabed scouring surveys.
Primary Responsibilities
* Preparation, installation, and calibration of survey equipment during mobilisations and demobilisations.
* Perform subsea surveying task including running surveying lines utilsing MBES and processing gathered data, generating XYZ files and Geo TIFF Imagery
* Analysing acquired data to determine changes in seabed terrain when compared to Client supplied as-built data
* Ensure quality control and assurance is performed on all survey data acquired.
* Assist project to be completed in a safe and efficient manner.
* Assist with line planning and other project preparations.
Project Details:
Start Date:
* 27th August 2024
Duration:
* 30 to 40 days
Location:
* Barrow in Furness, England, UK
Accommodation & Messing :
* Team will transit offshore daily and return to shore each evening where they will be accommodated, whilst a daily per diem shall be paid for subsistence.