5 days ago Be among the first 25 applicants
* Assist in the construction and dismantling of formwork for concrete structures
* Measure, cut, and assemble formwork materials such as wood, metal, and plastic
* Must be able to do Tamp Finish, float finish, brush Finish, Trowel finish, Power float finish and able to make good of concrete
* Ability to read and interpret drawings, and specifications accurately and implement on site
* Proactive and able to manage time effectively
* Able to work independently and as part of a team
* Reliable & punctual
* Able to work well with other trades and operatives on site and support the programme delivery on time
* Right to work in the UK
Reports To
Concrete Foreman
Department
Construction
Cards & Qualifications Required
* CSCS Green Card
Essential Role Requirements
* Minimum of 2 years’ experience
* Assist in the construction and dismantling of formwork for concrete structures
* Measure, cut, and assemble formwork materials such as wood, metal, and plastic
* Must be able to do Tamp Finish, float finish, brush Finish, Trowel finish, Power float finish and able to make good of concrete
* Ability to read and interpret drawings, and specifications accurately and implement on site
* Proactive and able to manage time effectively
* Able to work independently and as part of a team
Desirable
* 5+ Years experience
General Expectations
* Reliable & punctual
* Able to work well with other trades and operatives on site and support the programme delivery on time
* Right to work in the UK
We do have high standards for the work carried out on our sites, and in exchange, we hope to provide:
* Additional contracts for prospective projects when the current project is reaching completion.
* Additional training (subject to specific site requirements)
Seniority level
Entry level
Employment type
Full-time
Job function
Management and Manufacturing
Industries
Construction
#J-18808-Ljbffr