Petrofac is seeking a Senior Instrument Designer - Contractor for 12 months based in Aberdeen, UK. The role is outside IR35 and we invite Limited Companies to engage. Scope of Services:
* Provide design input to estimates for project work scopes
* Provide technical design expertise to specify modifications to existing equipment or purchasing new equipment including:
* DCS, ESD F&G and Metering system modifications
* Field Instrumentation including Pressure, Level, Temperature, Flow and Specialist Measurements.
* Valves
* SIL, High Integrity Systems (HIPPS)
* Measurement and Metering
* Industrial Networking and Communications
* Provide technical design expertise to the resolution of technical queries ensuring that all design changes are captured by the change control process
* To be able to conduct site surveys on offshore or onshore assets
* To be able to produce calculations required for the role and participate in design reviews.
* Production of discipline documentation deliverables for inclusion in work packs.
* Provide a level of technical support that satisfies the appropriate Asset Safety Case and that the PFEER performance standards ensuring they are not compromised by any discipline engineering activities
* Compliance with company engineering procedures, industry, international and client codes and standards.
* Ensure that all work complies with the Contract Health, Safety, Environmental and Quality policies and procedures as appropriate.
Deliverables:
* Block Diagrams or Single line diagrams
* Cause & Effect Diagrams
* Instrument Cable Block Diagram
* Cable Tray Routing & Layout Diagrams
* Panel; Control Room; F&G and Equipment Room Layouts
* Panel Wiring Diagram
* Destruct Drawing
* Instrument Mounting / Support Details
* Logic & Loop Diagrams
* Schematic Diagrams
* Cable Interconnection Diagrams
* Cable; Panel & Junction box Termination Diagram
* Junction Box Termination Diagram
* Pneumatic; Chemical and Hydraulic Hook-up Diagram
* Pneumatic; Chemical and Hydraulic Hook-up Schematic
* Installation or story board diagrams to facilitate understanding
* Cable Schedule
* Requisition - Bulk Bill of Materials