Our client is looking for an Electrical Project Engineer to work with them on a sugar plant in Bury St Edmunds. This will be an initial contract for 3 months but this will likely be extended to over 12 months as the project progresses.
The scope is to develop documentation required for the project program select phase, which is due for approval before end of March 2025.
This project is designed to enable improvements in operational efficiency through the replacement of obsolete control systems and Motor Control Centres (MCCs), which are critical for the seamless operation of equipment.
An Electrical Project Engineer is required to develop high level design of the existing system and provide recommended design for the next 5 phases of the project. Electrical Project Engineer will be required to provide estimate costing of the MCC upgrade for all 5 phases. The detailed engineering is not required at this stage of the project.
Electrical Project Engineer Scope
The purpose of the work done in this phase is to provide documentation required to provide information to the Project Steering Committee to be able to get decision/approval for the next 5 phases of the project. This includes selection of the MCC areas for each of the 5 phases of the project based on cost, benefit, and risk analysis. The documentation will provide a high-level capital required for the next 5 phases of the project. The major constraint for this project is limited plant shutdown peri...