Section Engineer - Cornwall
Location - Newquay
Duration 12 Months+
Tier 1 (Contractor)
Civils - Job Description Below
The A30 Chiverton to Carland Cross is a Design and Build contract for 12.5km (8 miles) of new dual carriageway between Chiverton Cross & Carland Cross roundabouts on the A30. This is the final section of the A30 between Redruth & Exeter that requires dualling, the majority of the existing single carriageway A30 will be retained for local traffic.
The scheme is due to commence in April with the detailed design and surveys with the construction works starting late summer 2020 for a period of 30 months.
The Section Engineer will report to the respective Section Manager and be responsible for planning, programming and co-ordinating works associated with the main office compound, this may include certain aspects of setting out on-site. The Section Engineer will also undertake works associated with the drainage section for the A30 Project, this will include reviewing drawings / buildability / specification / programme / materials / site surveys of existing drainage / etc.
The Section Engineer's tasks will include, but not limited to,
· Planning the layout of the main office compound which will include the office layout / car parking / pedestrian routes / storage area's / drainage runs / ducting layout / service routes etc.
· Take off / schedule of materials required for the works.
· Preparation of RAMS ...