Active Pathways are looking for an experienced Substation Fitter to work on a new build substation project for a battery storage site in Droitwich.
Main duties:
1. Earthing
2. Putting up structures
Duration: 2 months work minimum.
About Us:
Active (Pathways) Solutions Ltd specialise exclusively in the supply of temporary and permanent labour to the following sectors: Power (Transmission and Distribution), Interior Fit Out, Construction, and Civil Engineering.
If you feel you are suitable for this position or similar projects in the near future, please contact a member of our experienced team on (phone number removed) to have a discussion with one of our experienced consultants.
#J-18808-Ljbffr