Eastern Green Link 2 (EGL2) project is a 5-year project which will see the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. This will be the longest HVDC Cable in the UK and the UKs single largest transmission project ever, providing enough power for 2 million UK homes. The project is a JV with Hitachi Energy (HEBA
Please double check you have the right level of experience and qualifications by reading the full overview of this opportunity below.
Please click on the apply button to read the full job description