400kV Senior Authorised Person - Offshore wind - Onshore/Offshore substation - 2/2 rotation - All inclusive day rate, outside IR35 - May start date - 12 month (potentially up to 24 months)
Hunter Philips are partnered with a leading renewables company who are responsible for the Safety from the System on an offshore wind farm in construction in the UK. We are looking for a seasoned 400kV SAP to work on either the onshore or offshore substation. You must have a solid understanding of HV Safety from the system.
Key Responsibilities:
* Preparing, writing and issuing switching schedules
* Preparing, issuing and cancelling safety documents and permits
* Switching on the 400kV network
* Acting as an interface with other 3rd parties
* Train up the junior SAPs, APs and CPs
* Liaising with the Control Room
* Reviewing the method statements
* Acting as Control Engineer as and when required
* Ensuring Safety from the System
Requirements:
* Completed a previous offshore wind farm
* Minimum 1 year as a 400kV SAP (preferably on a wind farm)
* Experience commissioning
* Basic protection testing is desired but not essential
* Full clean driving license
* DNO/National Grid experience is desired but not essential
* Willingness to participate in a standby Rota
If you are looking for a new project for summer and you meet the relevant requirements then please send your CV to [emailprotected] or message me and get a call booked in to discuss your next role.
#J-18808-Ljbffr