Pre-assessments are a much more cost-effective way of screening properties for suitable measures across ECO4 and GBIS.
We have won a project performing pre-assessments for a large lead generator, which fall between a DEA and RA. In summary, it involves data collection, photos, and a floor plan. There's no lodgement, no occupancy, and very limited condition reporting. If measures can be installed, their own RA team goes out afterwards.
They will determine the funding routes for ECO4 and GBIS, and each assessment takes 60-90 minutes. All work will be within your specified postcode radius and scheduled in advance. The end client will fill your diary on the days that you specify, and payment is weekly, one week in arrears through CSG.
Minimum Requirements:
1. RA qualification
2. Current DBS
3. Insurance
#J-18808-Ljbffr