We have a current opportunity for a Documentation Project Co-ordinator on a contract basis. The position will be based in Bridgwater 3 days a week. This is an inside IR35 position at £130 PAYE or £230 via approved umbrella. For further information about this position, please apply.
HPC is one of four EPR Technology Power Stations and has close links to EDF's Energy's existing nuclear business. As part of the development of the HPC Strategy, it is important that we embed the lessons learned from the other EPR Technology Power Stations and EDF's Energy's existing nuclear business.
The role is based within the Technical and Safety Support Team, part of the Pre-Operations function, which is a part of the HPC project.
The role of the Pre-Operations function is to ensure that the future operating organisation, including people, working arrangements, equipment, facilities, and documents are ready for when Hinkley Point C starts generating electricity.
The Pre-Operations function is split into four different areas at present, led by a Programme Manager.
#J-18808-Ljbffr