Hours of work are 8.00 a.m. to 5.30 p.m. Monday to Friday with the possibility of some Saturday mornings.
This is an active role based on a construction site. The position will involve approximately 50% labouring and 50% telehandler operating. There will be the necessity to traverse the site across and around excavations and rubble and work during inclement weather should the need arise.
To keep production supplied by retrieving materials and supplies, operating a 7 metre telehandler on a construction site.
To plan supply material requirements as directed.
To maintain an inventory in the production area by anticipating and tracking usage.
To monitor the inventory by reporting discrepancies.
To keep production area clear by securing and moving finished pallets and moving empty pallets.
To document actions by logging movement of supplies, materials and finished goods.
To maintain a safe work environment by watching out for foot traffic, following standards and procedures, complying with legal regulations.
Keep telehandler operating by following operating instructions, troubleshooting breakdowns, maintaining supplies, performing preventative maintenance and calling for repairs.
Updating job knowledge by participating in educational opportunities.
To carry out general labouring duties including sweeping and tidying to maintain cleanliness of the site, to assist the site management and various trades on site as required.
There will, at times, be the necessity to access scaffolding by means of a ladder and work on the scaffolding, or from a ladder.
The job will involve loading and unloading of material either into store or across the site. This will involve manual handling of heavy and/or awkward objects.
The job will involve keeping Welfare facilities (offices, canteen, toilets, etc.) clean and tidy.
To carry out other reasonable duties as directed by the site management.
APPLICANT MUST HAVE OWN TRANSPORT AND BE ABLE TO ATTEND THE SITE IN A TIMELY MANNER.
The job will be of a permanent nature for the duration of the site build (approximately 8 months).