We are currently searching a Cable Termination and Installation Specialist to work on Offshore Wind Farms.
Location: Hull, United Kingdom
Employment: Permanent
Salary
1. £600/£700 per day
2. Overtime available
The Role
The main role of this position is to ensure compliance of cable installation against schedule/procedures/HSE requirements/ Contract guidelines and other duties, and activities required by the company.
Requirements
You will report to the Cable Installation or Termination Manager and will be required to review and understand:
3. Contract Documentation
4. Contract Installation or Termination Procedures
5. Engineering Design Drawings
6. Site Documentation
7. Load out Procedures
8. Schedules
9. Project HSSE Requirements
10. Cable manufacturing guidelines
Other requirements:
11. GWO qualified
12. Offshore Medical and Survival
13. Working from height
14. Turbine climbing/access certificates
15. Rigging and back deck operations
16. NEBOSH will be considered a bonus
Skills Provision is an ethical international recruitment agency, as such our adverts do not discriminate with regards to age, race, gender, colour, creed, religion, sexual orientation, disability and nationality.