MANE Infrastructure are on the look for a number of Steel Erectors/Fitters to work on abridge refurbishment project located in the Bridgwater area.
Duties will involve under plating of the existing bridge, as part of a strengthening and refurbishment project.
Applicants will be required to measure, cut and fit steel work. Being able to read and interpret engineering drawings is required.
Working Hours:
07:00am till 17:00pm