Electrical Testers required Work until end of March 2025. Hours - 7.00am - 5.00pm Electrical Testers required to carry out electrical install and testing work on a solar farm, You will be required to do installation and testing work and the continuity and resistance testing and to Inspect the electrical installation which has been carried out. You must be an experienced electrical tester with a valid Gold ECS card and either 2391 or 2394/2395 and be able to provide references where you have previously carried out electrical testing work before. There could well be Saturdays on offer in the new year at a time and a half pay