Social network you want to login/join with:
col-narrow-left
Client:
Location:
Job Category:
Other
-
EU work permit required:
Yes
col-narrow-right
Job Reference:
ae693dd4b798
Job Views:
8
Posted:
26.04.2025
Expiry Date:
10.06.2025
col-wide
Job Description:
Your company
To monitor project works at multiple sites for the installation of retrofit measures.
To liaise regularly, and provide information to, the retrofit coordinators, Savills Consultants, in order to ensure compliance with designs, quality of works and adherence to health and safety requirements.
To be the client-facing representative on site for the works, and undertake tenant engagement as required, with support from the project administration team and the constructor tenant liaison officers.
Your new role
1. Inspecting construction work and comparing it with drawings and specifications.
2. Measuring and quality checking building materials.
3. Identifying defects and suggesting ways to correct them.
4. Monitoring progress and reporting to retrofit coordinators and project quantity surveyor.
5. Keeping detailed records of work including photographs. The retrofit coordinator will depend on the CofW providing appropriate and sufficient evidence that works are progressing compliantly.
6. Referring to plans and taking photographs of work, along with measurements and samples.
7. Liaising with contractors, engineers and surveyors.
8. Checking that building regulations, health and safety, legal and ecological requirements are met.
9. Working between an office and construction sites.
10. Ensuring written correspondence to residents is generated and distributed in line with the programme of works and the tenant engagement plan.
11. Collaborating with the main contractor and Savills assessors to ensure access to properties by contacting and arranging with residents.
12. Attending site events as agreed with the project manager and maintaining regular visits to site to meet tenants and liaise with the contractor on retrofit-related tenant issues.
13. Initiating actions and coordinating with the contractor and other GSA staff and departments where tenant issues require a team intervention, e.g., where hoarding has been identified.
14. Coordinating any complaints about the works or project process.
15. Raising or adjusting works or repair orders as required, or ensuring such orders are raised by the appropriate resources as identified by the project manager.
Additional notes
The description contained duplicate sections and inconsistent formatting. It is recommended to consolidate the information into a clear, well-structured format, removing redundancies and correcting typographical errors for clarity and professionalism.
#J-18808-Ljbffr