PTS Electricians needed to jump on Railway project. Farncombe to Petersfield Requriements: 18th edition PTS ECS/JIBOutline of work: Installation of new 3kva transformer within the new FSP already on-site The 3kva transformer will either be swapped for a 1.5kva transformer or if there is enough space within the FSP the transformer and associated wiring shall be installed The purpose of the new transformer is to change the existing SMIEOH DB from IT to TN system Installation of a new 1cu10mm earth cable between the FSP and SMIEOH DB Installation of a new 1cu35mm earth cable between the FSP earth bar and SMIEOH earth bar Undertake Telecom Rack Battery Installation Undertake Telecom Rack Battery Cable Testing Undertake Telecom Rack Battery Discharge Testing Undertake Telecom Rack Battery Impedance and Voltage Measurements Test Carry out an alteration to an existing circuit certificate and relevant testing associated with this For more information please contact Fred Kilburn at (phone number removed)