We have secured a warehouse extension using a steel portal frame, cladded on the walls and roofing. The existing site is a plastic packaging company.
I need an SMSTS supervisor, ideally with steel frame experience, to start on-site immediately or close to and to run through to February. We have procured all trades for the install already.
Site address:
CJK Packaging
High Peaks
SK23 6DX
Reporting to myself and the managing director.
#J-18808-Ljbffr