Route upsized gas pipe up from meter through basement to under floor at bottom of stairs. Route up wall at bottom of stairs surface mounted and through wall at high level to outside wall. Continue gas pipe along outside wall and connect in with boiler in kitchen. Connect onto hot and cold pipes under kitchen sink and route behind fridge surface mounted in copper, clipping as necessary. Route hot and cold pipes up through kitchen worktop and surface mount to high level and across to connect with boiler from above with limescale reducer on cold. Route 22mm copper central heating pipes from new boiler location, above kitchen cupboards and through to middle room next to kitchen. Surface mount down wall and route under radiator replacing existing 10mm pipes. Must be corgi registered Barker Ross Group values diversity and promotes equality. No terminology in this advert is intended to discriminate against any of the protected characteristics that fall under the Equality Act 2010. We encourage and welcome applications from all sections of society and are more than happy to discuss reasonable adjustments and/or additional arrangements as required to support your application. For the purposes of the Conduct Regulations 2003, when advertising permanent vacancies we are acting as an Employment Agency, and when advertising temporary/contract vacancies we are acting as an Employment Business. ADZN1_UKTJ