Role - Document Author
Location - Somerset
Pay rate - £125 - £140 per day
Hours - Full time Hybrid working available (3 days working in the office is needed)
About the role
Our Client Site is one of four EPR Technology Power Stations and has close links to EDF's Energy's existing nuclear business. As part of the development of the HPC Strategy it is important that we embedded the lessons learned from the other EPR Technology Power Stations and EDF's Energy's existing nuclear business.
The role is based within the Operational Capability programme, part of Pre-Operations function, which is a part of the client's project. The role of the pre-operations function is to ensure that the future operating organisation, including people, working arrangements, equipment, facilities, and documents are ready for when Hinkley Point C starts generating electricity. The pre-operations' function is split into four different areas at present, led by a Programme Manager.
These programmes are:
Operate the Plant (i.e., control room operations, plant operating instructions)
Asset management (i.e., engineering, maintenance, work management)
Technical and Safety (i.e., chemistry, environment, radiological protection)
Operational Capability (i.e., training development, resources)
Principal Accountabilities
Writing, editing and proofreading text.
Collating and verifying information.
Copying text from multiple sources into a single d...